New Midland Train Station

Case Studies Location: Year: Client: Builder: RECENT WORKS Challenge The project demanded structural steelwork of high geometric complexity, produced and installed within a programme that left no room for sequencing delays or rework. Coordinating across multiple trades in a constrained, active urban construction site required absolute precision from design through to placement. The structural steel […]
St John of God Subiaco Hospital

Case Studies Location: Year: Client: Builder: RECENT WORKS Challenge Delivering structural steelwork within an active hospital environment presents challenges that go well beyond a standard construction site. Programme management must account for operational sensitivity, restricted access and the heightened safety requirements of a live healthcare facility. Any disruption to hospital operations was unacceptable, making sequencing, […]
Modular Gantries and Frames

Case Studies Location: Mitchell Freeway, WA Year: 2023-2024 Client: Main Roads WA Builder: Intelligent Freeway Alliance RECENT WORKS Challenge Highways and busy roads require digital signage that is visible, secure, and capable of withstanding environmental conditions and vibrations. Traditional gantry construction often leads to traffic disruption, high costs, and frequent maintenance. Meeting strict safety standards […]
ECU City Campus

Case Studies Location: Perth, WA Year: 2023-2025 Client: Edith Cowan University Builder: Multiplex Construction Pty Ltd RECENT WORKS Challenge The Edith Cowan University was building a new City Campus project and it needed structural steel for the several key buildings in the new creative industries portion of the campus. Because the project is located in […]